Projects

Swimming Pool in Świętochłowice

  • Sector: Public utility facilities

Design and execution of revitalization works of the urban swimming pool in the natural pond technology based on an unused swimming pool at the OSiR “Skałka at Aleja Parkowa 15 in Świętochłowice, construction of a multifunctional building and landscaping around the swimming pool in the formula  “design and build” with the author’s supervision over the realization.

Project co-funded by the European Union through the Regional Operational Programme of Silesia in 2007-2013, Priority 6. Sustainable urban development, Measure 6.2. Regeneration of degraded areas, Submeasure 6.2.3. Revitalization – JESSICA